The effect of regular, skilled preventive maintenance on critical power system reliability

Posted: December 09, 2009 in White Papers
Region:

ABSTRACT

When correctly implemented, PM visits ensure maximum reliability of data center equipment by providing systematic inspections, detection and correction of incipient failures, either before they occur or before they
develop into major defects that result in costly downtime.

FULL DOCUMENT

When correctly implemented, PM visits ensure maximum reliability of data center equipment by providing systematic inspections, detection and correction of incipient failures, either before they occur or before they
develop into major defects that result in costly downtime.